One of the first questions we hear from homeowners is simple: "How long will it all take?" A bespoke kitchen is built to your exact measurements rather than pulled off a shelf, so the timeline looks different from a flat-pack project. At Creo Interiors, we believe that knowing the stages in advance removes most of the stress, so here is what a typical project looks like from first conversation to final handover.
1. Design and Planning: Take the Time to Get It Right
This is the stage where the kitchen is really made. It includes the first showroom consultation, a site measure, layout options, 3D visuals and decisions on door style, worktops and appliances. The more decisions you settle here, the smoother everything that follows.
- Measure and survey of the room, including services, windows and uneven walls
- Layout and 3D design, usually refined over a couple of rounds
- Material and appliance choices, ideally confirmed before anything is ordered
If you're still weighing up the style, our comparison of modern vs traditional kitchens is a good place to start, and you can request a design quote at any point.
2. Joinery and Ordering: Where Bespoke Takes Longer
Once the design is signed off, the cabinetry is built, sprayed or painted to order. Hand-painted and lacquered finishes need time to cure properly, and worktops such as quartz or Dekton are templated and fabricated to your final layout. Lead times vary with the finish and the supplier, so we give you a clear estimate at the quotation stage rather than a vague promise.
Appliances are worth ordering early, since the cabinets are cut around their exact dimensions. Our guide to integrated kitchen appliances explains what to confirm before you commit.
3. Preparing the Room and Installation
While the joinery is being made, the room can be prepared: any building work, plastering, electrics, plumbing and flooring. Installation itself is usually the quickest stage, but the order of trades matters.
- Strip out the old kitchen and complete first-fix work
- Finish walls, ceilings and flooring
- Fit cabinets, then template and install worktops
- Connect appliances, plumbing and lighting, then complete the final snagging
Whether it's one of our contemporary kitchens or a classic traditional kitchen, the same careful sequence applies.
4. How to Keep Your Project on Schedule
Most delays are avoidable. Kasia and Tomek recommend a few simple habits:
- Decide early on appliances, taps and handles
- Allow for the unexpected behind old walls and floors
- Plan for life without a kitchen, with a temporary setup for a few weeks
- Keep one point of contact so decisions never stall
Visit our Celbridge showroom and we will talk through a timeline that fits your home and your calendar.
Ready to Start Planning Your Kitchen?
The best kitchens are never rushed, and a clear plan means you can enjoy the process as much as the result. Our in-house team looks after everything from design to installation.